Strömsund Bridge
Quick Summary
The Strömsund Bridge, completed in 1956, is an early example of a cable-stayed bridge design. Located in Sweden, this type of bridge features cables that run directly from the tower to the deck, offering a distinct structural approach compared to suspension bridges. The Strömsund Bridge specifically utilized two cables anchored near the top of the tower, fanning out to support the deck at widely separated points. This design was part of a broader evolution in bridge engineering that began in the 1950s, moving away from traditional materials like wood and stone towards iron, steel, and concrete.1
Ask Britannica AI about this topic
Britannica doesn't have a full article on this topic, so we've curated a list of our relevant coverage.

