What do topping and bottoming mean in a coal-fired MHD power plant?

Created from Britannica articles using AI. AI can make mistakes, so verify using Britannica articles.

In a coal-fired magnetohydrodynamic (MHD) power generator, the terms topping and bottoming refer to the two stages of a binary cycle designed to maximize efficiency.2

  • Topping: This is the initial phase where high-temperature, electrically conducting gas—produced by burning coal—is passed through the MHD generator. During this stage, the gas's kinetic energy is converted directly into electric power as it expands through a magnetic field.12
  • Bottoming: Once the gas temperature drops to a point where thermal ionization is no longer sufficient for efficient MHD power production, it is directed to the turbogenerator of a conventional steam plant. This secondary phase captures the remaining thermal energy to generate additional electricity.2

By combining these two processes, an open-cycle MHD system can achieve significantly higher overall efficiency than a standard power plant.12