How are suspension-bridge deck sections installed after the cables are complete?

Created from Britannica articles using AI. AI can make mistakes, so verify using Britannica articles.

Once the main cables of a suspension bridge are complete, the construction process proceeds by hanging suspenders from those cables. The deck is then erected by floating individual deck sections out to the site on ships, hoisting them into position using cranes, and securing them to the suspended structure.12