What kinds of projects did the Mekong Committee support?
The Mekong Committee, established in 1957, has supported a wide range of initiatives focused on the development and scientific investigation of the lower Mekong basin. Its projects generally fall into two categories:
Infrastructure and Construction
The committee has undertaken the construction of various water-management projects, including:
* Multipurpose dams: Such as the project near Nam Phong in northeastern Thailand.1
* Hydroelectric dams: Including the facility at Nam Ngum in Laos.1
* Water control systems: Projects designed to improve irrigation and flood control, which allow for multiple crop cycles per year and reduce losses from flooding.1
Scientific and Preinvestment Investigations
The committee has sponsored extensive research and planning efforts, including:
* Data collection: Basic mapping, hydrologic observations, and flood forecasting.2
* Technical and environmental studies: Soil surveys, fisheries research, health studies, and engineering-feasibility studies.2
* Agricultural development: Power-market surveys, agricultural research, and the establishment of pilot farms.2
* Comprehensive planning: Since the mid-1970s, the focus has shifted toward integrated programs for community and agricultural development in areas with reliable water supply.2