In the context of the Deepwater Horizon disaster, drilling mud served two primary purposes:
- Operational Drilling: During standard operations, the mud was injected into the well to lubricate and cool the drill bit, flush rock cuttings to the surface, and provide hydrostatic pressure to stabilize the borehole and prevent the collapse of unstable strata.123
- Emergency Containment: Following the explosion, drilling mud was used in attempts to stanch the flow of oil. During the "top kill" and "static kill" procedures, the heavy fluid was pumped into the well to counteract the upward pressure of oil and natural gas, effectively acting as a counter-force to stop the discharge.42